| Most viewed |

Birds Eye View160 viewsBirds Eye View
|
|

K5_a146 viewsOld computer room.
|
|

multi_i146 viewsThe big crane is on site 07/31 and is preparing to lift the two remaining walls.
|
|

entry1144 viewsentry picture #1
|
|

multi_f144 viewsThe roof for the multipurpose room is built on the ground and then will be lifted with the big crane to it's final position on the new MP building.
|
|

Lib_c144 viewsLibrary is gutted and is ready for new cabinets, bookshelves, lighting, and technology.
|
|

multi_g142 viewsFraming and sheathing
|
|

Evening 1139 views
|
|

Quad 6138 views
|
|

Quad 5137 views
|
|

Main_f135 viewsRoof removed and stucco being prepped for new paint.
|
|

Lib_b134 viewsOld library.
|
|

Quad 7129 views
|
|

Quad 2125 views
|
|

Evening 2119 views
|
|

Tile in Kindergarden117 views
|
|

Almost Done117 views
|
|

Quad 1116 views
|
|

Quad 8116 views
|
|

Fountain 1114 views
|
|

Cafeteria113 viewsThe old cafeteria and sitting area.
|
|

Quad 3110 views
|
|

Move a Room106 viewsMove a Room
|
|

Fountain 2105 views
|
|
|
|