Multipurpose Room |
 |
| TITLE |
+ |
- |
| FILE NAME |
+ |
- |
| DATE |
+ |
- |
| POSITION |
+ |
- |
|
|

multi_f144 viewsThe roof for the multipurpose room is built on the ground and then will be lifted with the big crane to it's final position on the new MP building.
|
|

multi_g142 viewsFraming and sheathing
|
|

multi_i146 viewsThe big crane is on site 07/31 and is preparing to lift the two remaining walls.
|
|
|
|
|